24 Jun The Assembly
The pieces are ready. The engine is ready. The bay is open. Let’s do this.
Everything’s finally ready for the E90 velocity stack system to be installed. In case you haven’t noticed, there’s quite a few pieces that need to be installed:
As always, the velocity stacks ended up looking fantastic. A little bit of stealth welding extended their length to the proper parameters, so we’re looking forward to hearing this puppy start up for the first time:
In terms of the craftsmanship that went into this design, everything that wasn’t done on the mill was done by hand, including these grooves on the support poles:
So, all that’s left for this kit is the installation. Noses are to the grindstone, but this is going to be too much fun to be considered ‘work.’
Get excited.
No Comments